Status on 02jun10: Reco Reconstruction and AOD merge tasks are monitored for the following: mc09_7TeV-4 (mc09_7TeV: r1250,1251; merge is r1260) mc09_7TeV-5 (mc09_7TeV: r1302; merge is r1260) Action last week ---------------- None. Status ------ A summary of the status for each of the above groups may be found at http://www.usatlas.bnl.gov/~dladams/prodhist/status Changed since the last report: mc09_7TeV4, mc09_7TeV-5 mc09_7TeV-4 summary for 717 samples State Reco Merge good 679 646 accepted 0 0 skipped 0 31 bad 3 5 active 1 1 waiting 34 34 mc09_7TeV-5 summary for 48 samples State Reco Merge good 48 48 accepted 0 0 skipped 0 0 bad 0 0 active 0 0 waiting 0 0 good = Samples complete with at least 95% of requested statistics accepted = Samples complete with less than 95% of statistics accepted as is. skipped = Samples for which no action should be taken. bad = Samples complete with less than 95% of statistics that are unresolved or being extended active = One or more tasks pending, submitting or running missing = No tasks submitted (or all tasks failed, aborted or obsolete) Note: The fraction of each sample completed is calculated using the nominal number of events in all finished and done tasks. The actual number of events run and successful in such a task may be less and so the fraction may be an overestimate. Issues this week ---------------- None.