Muon reconstruction in release 17.0.3.4

D. Adams
September 2011


Release 17.0.3.4

For other releases, see the complete list of results.


Issues were last reported in 15.6.1.2.


Graphical summaries

Plots created for physics validation (16sep2011)
    T1 validation of this release and MC11 sim
Plots created for physics validation (30sep2011)
    T1 validation of Atlfast II in this release
Plots created for physics validation (17nov2011)
    Zmumu check of observed shift in muon scale
    T1 check of observed shift in muon scale
    T1 check of 64-bit digi+reco



dladams@bnl.gov