Muon reconstruction in release 14.2.23.1
D. Adams
November 2008
Release 14.2.23.1 is for production.
For other releases, see the complete list of results.
For issues, see 14.2.22.1.
Graphical summaries
Plots for 04nov physics validation meeting
T1 history with reference geometry (from 14.2.23.2)
T1 checks of geometry, simulation and truth strategy
Mu100 pileup check
Plots for 04dec physics validatiion meeting
ATLFAST w/o and w/ new truth strategy
dladams@bnl.gov