SiteCertificationR1

Tier2 site expectations

Site admins execute a pre-production readiness processes so as to fill in the below table with current status. Site admins will fill in the table with the latest status. The table will be reviewed on a weekly basis.

Site readiness table

Site Tests
  OSG 0.6 passing basic functional tests for CE and SE ATLAS Releases with KitVal tests DQ2 0.3 DQ2 certified: ability to process reference subscription Logging configured Pilot checker Panda test jobs-local Load test readiness
AGLT2 OK              
BNL_ATLAS_1                
BNL_ATLAS_2                
BU_ATLAS_Tier2                
BU_ATLAS_Tier2o                
IU_ATLAS_Tier2                
MWT2_IU                
MWT2_UC                
OU_OCHEP_SWT2                
OU_OSCER_ATLAS                
PROD_SLAC                
SLACXRD                
UC_ATLAS_MWT2                
UC_Teraport                  
UTA-DPCC                
UTA_SWT2                

-- RobertGardner - 10 May 2007

About This Site

Please note that this site is a content mirror of the BNL US ATLAS TWiki. To edit the content of this page, click the Edit this page button at the top of the page and log in with your US ATLAS computing account name and password.


Attachments

 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback