Background

The description from Phase1 applies, OSGservicesP1.

Schedule

The focus in this phase is to prepare ITB sites for OSG 0.8, validate OSG services, and Panda validation. Check accounting end-to-end (site to WLCG).
  • 8/6: identify sites for ITB
    • BNL, UC, OU
  • 8/15: begin ITB 0.7 installations at sites
  • 8/21: complete ITB validations of OSG services; start Panda validation
  • 8/31: complete Panda validation
  • 9/30: Production OSG 0.8 deployed on selected sites deferred, OSG schedule slipped to November 1

Results

  • 9/07: ITB 0.7.0 successfully deployed on three US ATLAS sites: BNL, UC, and OU.
  • 9/15/07: Full Panda chain validated on UC_ITB with 20 successful jobs

-- RobertGardner - 15 Aug 2007

About This Site

Please note that this site is a content mirror of the BNL US ATLAS TWiki. To edit the content of this page, click the Edit this page button at the top of the page and log in with your US ATLAS computing account name and password.


Attachments

 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback