r5 - 22 Apr 2009 - 12:26:52 - RobertGardnerYou are here: TWiki >  Admins Web > IntegrationPhase8

Phase 8 (Jan 1 - Mar 31, 2009 - FY09Q2)

Notation: led-green completed led-blue work is in progress led-gray defer to next phase

WBS Deliverable Description Major Milestones Status Resource
1 P8 Integration Phase 8: deployment, validation Staff, Tier1 + Tier2 centers
1.1 ATLAS releases ATLAS releases via Pacball & DDM Mar 1 led-gray Xin, Fred, Torre
1.2 Fabric upgrades Compute and storage upgrades Mar 31 led-green Tier2
1.3 Network monitoring services US LHC network monitoring infrastructure: validation Mar 1 led-green Networking group
1.4 Bestman validation Validate OSG/VDT based Bestman Feb 1 led-green OU, SLAC, BU, UTA
1.5 Squid servers at Tier 2 Conditions data access at Tier 2 Mar 1 led-gray SLAC, ...
1.6 Load tests 200/400 MB/s and multi-site 1 GB/s Read/write sustained BNL-Tier2 Mar 31 led-gray Networking group
1.7 Storage Validation Disk, LFC, DQ2 catalog validation Mar 1 led-gray all sites
1.8 Site certification Table Site certification and benchmarks registered Mar 31 led-green all sites
1.9 Analysis Benchmarks Boxed analyses across sites various led-gray FacilityWGAP
1.10 US ATLAS Facility clients US-specific support for various ATLAS and OSG clients for admins and physicists on-going led-green Marco
1.11 Summary Report Summary report Mar 31 led-green all

Calendar and Milestones


-- RobertGardner - 14 Jan 2009

About This Site

Please note that this site is a content mirror of the BNL US ATLAS TWiki. To edit the content of this page, click the Edit this page button at the top of the page and log in with your US ATLAS computing account name and password.


Attachments

 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback