Introduction

Deployment (procurement, installation, testing, integration) of storage and compute server upgrades at each site. Note: carried over from Phase 6:

Site plans

Tier 1

  • Gridftp door upgrade: 5 new doors - completed.

AGLT2

  • Target ~500TB of disk area (usable, after RAID6), (~396TB Tier-2, ~104TB Tier-3)
  • Target ~2200 KSI2K? of cpu power (1800 Tier-2, 400 Tier-3)

MWT2

  • Target: 300 TB raw storage
  • Status (12/22/08) procured:
    • MWT2_IU: 180 TB (raw), 160 cores
    • MWT2_UC: 180 TB (raw), 192 cores

NET2

  • 300T disk
  • 34 dual quad nodes, 272 cores, ~760 kSI2K

SWT2

  • 65 CPU units, 8 cores each at UTA
  • 500-600 TB at UTA
  • 100-150 TB at OU/Langston

WT2

  • 320 cores Intel X5355 2.66Ghz
  • 224TB usable

Milestone

  • Original Phase 6 milestone was September 15, 2008; was deferred to Phase 7 due to purchasing delays.


-- RobertGardner - 22 Dec 2008

About This Site

Please note that this site is a content mirror of the BNL US ATLAS TWiki. To edit the content of this page, click the Edit this page button at the top of the page and log in with your US ATLAS computing account name and password.


Attachments

 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback