r3 - 18 Sep 2008 - 10:56:35 - RobertGardnerYou are here: TWiki >  Admins Web > FabricUpgradeP6



Deployment (procurement, installation, testing, integration) of storage and compute server upgrades at each Tier 2 facility.

Site plans

Tier 1

  • Gridftp doors


  • Target ~500TB of disk area (usable, after RAID6), (~396TB Tier-2, ~104TB Tier-3)
  • Target ~2200 KSI2K? of cpu power (1800 Tier-2, 400 Tier-3)


  • Target: 300 TB raw storage
  • Target: 800 kSI2K defer until after storage procurement
  • Update 9/18/08: final stage of storage quotes from Dell and Sun.
    • MWT2_IU: 240 TB (raw)
    • MWT2_UC: 180 TB (raw)


  • 300T disk
  • 34 dual quad nodes, 272 cores, ~760 kSI2K


  • 65 CPU units, 8 cores each at UTA
  • 500-600 TB at UTA
  • 100-150 TB at OU/Langston


  • 320 cores Intel X5355 2.66Ghz
  • 224TB usable


  • September 15, 2008, the above deployed.

-- RobertGardner - 20 Aug 2008

About This Site

Please note that this site is a content mirror of the BNL US ATLAS TWiki. To edit the content of this page, click the Edit this page button at the top of the page and log in with your US ATLAS computing account name and password.


Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback