  • Place here anticipated hardware upgrade activities anticipated during this quarter (Jan 1 - Mar 31, 2013)
  • Update SiteCertificationP24 with progress, as appropriate.
  • At the end of the quarter we will update the US ATLAS Facility spreadsheet with newly deployed storage and compute resources (c.f. CapacitySummary).
  • Previously, FabricUpgradeP23


last phase:

this phase:


last phase:
  • Still integrating storage purchases from last quarter, all of which have now been delivered
  • No further purchases expected for this phase.
this phase:
  • Storage successfully integrated.
  • Replaced three 8-core Intel E5440 nodes with 3 32-core Intel E5-2665 nodes


last phase:
  • Planning purchase of approximately 1 PB during this phase between UC and IU. UIUC will add 25 compute servers to its campus cluster, plus about 300 TB.
  • At UC, orders have been placed for 1080 TB (usable) plus an 10g switch
  • As of end of quarter, orders are being prepared for IU and UIUC procurements.
  • Electrical work ordered for UC's server room for two new racks of UPS power.
this phase:
  • Installed 500 TB usable storage at UC
  • Upgraded UC network - adding 40G bonded channels internally between Dell 8024F stack, Cisco 6509, and Dell 6248 stack. Completed March 31.
  • At of end of quarter, still have 500 TB additional storage to bring online. *14 new R420 compute servers at UIUC delivered, to be brought online in the next couple of weeks.
  • Added 300TB of disk to UIUC DDN (total now 400TB). Will be brought online in the next two months


last phase:
  • Preparing for two new storage racks (r710/720/610 + md1200 3TB drives) to be ordered ASAP
  • Electrical work in machine room and configuration with Dell
this phase:
  • New storage (576TB useable) online
  • Preparations for move to Holyoke


last phase:
  • UTA: Installed 480TB storage at SWT2_CPB
  • OU: ordered 160 TB DDN storage
this phase:
  • OU: About to add this storage into Lustre


last phase:
  • 6 R610 + 44 MD1200 w/ 3TB drives
this phase:

-- RobertGardner - 20 Feb 2013

About This Site

Please note that this site is a content mirror of the BNL US ATLAS TWiki. To edit the content of this page, click the Edit this page button at the top of the page and log in with your US ATLAS computing account name and password.


Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback